LiFePO4 packs engineered for 28V DC ground power units working the apron, built as an ODM programme against your input voltage window, cranking current and duty cycle. This is not a catalogue item, and we say so plainly, because a GPU pack that starts an engine is a different engineering problem from a solar battery.
Request a QuoteSolar cycling is a slow, shallow, predictable load: a few kilowatts drawn for hours, then a long recharge. An apron ground power unit does the opposite. It holds a 28V DC bus steady for avionics, pre-flight checks and maintenance work, then delivers a short and very high current burst when the unit starts an engine or an APU. Those two duties pull the cell, the busbar and the BMS in different directions. A pack optimised for one will fail at the other, which is why we build GPU packs to a stated duty cycle rather than quoting a generic kilowatt-hour figure.
Engine start is the constraint that shapes everything else. A start is tens of seconds, not hours, and the current is an order of magnitude above the continuous avionics load. Cell model, nickel or busbar cross-section, contactor rating and BMS overcurrent threshold all follow from that number. Get it wrong and the pack either trips on inrush or cooks its own terminals.
Without these five numbers any quote would be a guess, and a guess on an aviation programme costs both sides months. This is the list we send to every GPU enquiry.
| Input | Why it changes the design | What to send |
|---|---|---|
| DC bus voltage window | Sets series count, charge cut-off and whether an 8S pack fits at all | Minimum and maximum the unit accepts, plus nominal |
| Cranking current, peak and duration | Sets cell model, busbar section, contactor and BMS trip point | Peak amps, how many seconds, and whether it repeats |
| Duty cycle | Sets capacity and thermal design | Starts per day, hours on bus per shift, recharge window |
| Ambient temperature band | Sets heating, derating and enclosure assumptions | Coldest start, hottest apron day, sun exposure |
| Certification route | Sets the document pack and who signs what | Which body approves the finished unit, and at pack or unit level |
We hold no catalogue GPU pack, and we have not run a certified aviation programme. Saying otherwise would be a claim we cannot support, and a buyer who checks would be right to walk away. What we do have is a LiFePO4 platform in volume production, a BMS team that writes custom protection profiles, and the documentation discipline that a transport-regulated product needs.
If your programme needs a supplier who has already shipped a certified GPU, we are not that supplier today. If it needs a pack built to your duty cycle, with the engineering conversation happening before the price conversation, send the five inputs above and we will tell you honestly whether we can build it. Where we cannot, we will say so in the first reply rather than the third sample.